Here are some of the items I am considering
1. Around 200 switches
2. Two networks – I need approximately 600 links
3. All 8 button face plate switch with first button controlling the load and remaining controlling the switch.
. I understand Simply-automated makes the 8 button face plate switch, with first button controlling the load and remaning button controlling links, however they do not have back lit switches. HAI / PCS has back lit switch but need seperate switch to control the load.
Any one can help me which is better.
Thanks
#2
Posted 20 January 2008 – 10:54 PM
#3
Posted 21 January 2008 – 12:51 AM
#4
Posted 21 January 2008 – 07:36 AM
#5
Posted 21 January 2008 – 07:52 AM
#6
Posted 21 January 2008 – 08:10 AM
Large installers any insight?
Thanks
Jijo
#7
Posted 21 January 2008 – 09:02 AM
yes, the SAI’s control a load. that is, they are a switch and a controller all in one. i always thought it a little odd that other controllers don’t control a load like a switch. i mean, why would they make the assumption that retrofits always have extra j-box space around to put these things?
whether or not you have to worry about noise likely has little to do with the size of your install… either you will have noise or you won’t, but given the vast distances a upb signal can travel, i doubt you will run into that limit in your house. if you are worried that much about it, it sounds like gen-ii is the only way to go, and obviously get a split-phase repeater.
#8
Posted 21 January 2008 – 10:51 AM
Edited by hucker, 21 January 2008 – 12:33 PM.
#9
Posted 21 January 2008 – 10:56 AM
#10
Posted 21 January 2008 – 03:30 PM
The SA 8 button controller is a US240 (details found HERE)which can use many different face plates that can be seen HERE.
You will also see the pre cut labels available.
In my largest install (Ultimately 120 devices) I used PCS rocker switches for most of the install and the US240 (configured top rocker/4button for room control of scenes.
Here Copy_of_OCT_27_2006_Sample.txt 74.31K 63 downloads is a sample UPStart file you can download and look at that shows how I set up each room. Each room had local control of 3 lighting scenes and an (all off). Each scene was brighter then the previous (infinitely adjustable) with the lower right button the (all off) for the room. This pattern works well as the owner can learn from the 3 buttons which lighting scheme they like, and where the (all off) is. Rooms with 3 or more loads worked great this way. Before the owner had to set each switch to the dim level they wanted one at a time. Now they almost never touch the load control switches. In UPStart open a room folder to get an idea from the icons what the switch plate looked like.
To view the file in UPStart you must right click on it download it using “Save target as” and change the suffix to .upb. You should also change to “All files” right under where you change the .upb
I used 8 button face plates at entrances to the house, giving the owner whole house scene control as they were entering or leaving the house. again I used the lower right button as an (all off) for the whole house. Generally I used the buttons on one side of the 8 to do outside controls; garage, garage door, garden, gate control, water fall….. the other side of the 8 button controls inside scenes including maybe path to bedroom if they didn’t need to turn on the whole house.
The sample I provide was early in the setup and programming and not exactly what we ended up with.
One note on the 4 buttons for the kitchen; The wife liked lights to come on instantly and the husband liked the 3 sec ramp up I was able to give them each a button to use when entering the kitchen that resulted in what they each liked.
I used PCS switches because I already had a 4 year history of using PCS x10 switches that were fantastic. Nearly no failures from 400 switches installed. As a retro fit I had to go with the SA US240 for control because they had to carry a load as well as to do scene control.
A feature not talked about much with UPB is scene “tweaking” in each room once the install and links are done. Basically you can adjust all the light loads of an existing scene while walking around the house, and then send a command to permanitaly teach each switch the new setting for that scene. I use this to walk around with the owner to custom set scenes to there liking. I can go into detail on that later if you are interested.
By the way this home has no central controller. Just a PCS timer module and a SA Scheduler/controller. All the scene/control functions are stored in each UPB device. The UPStart file holds the entire setup and can be used for restoration if necessary.
You will more than likely love working with UPStart in a large home with lots of loads. The ability to create beautiful and functional scenes is very easy with UPB
Dave
Edited by Event5, 22 January 2008 – 05:58 PM.
#11
Posted 21 January 2008 – 07:33 PM
#12
Posted 25 January 2008 – 03:30 PM
SA
HAI
UPB
If I need more than 250 in SA (I think that is the max). can I use two networks?
thanks
Jijo
#13
Posted 25 January 2008 – 03:42 PM
#14
Posted 25 January 2008 – 03:45 PM
Thanks
jijo
#15
Posted 25 January 2008 – 04:56 PM
At the end of the day,looks like both HAI and simply automated use upb,i like simply automateds lower pricing, more lighting options, fully compatible with HAI